DSP Interiors was appointed to design and install a bespoke mezzanine floor at our client’s facility in Winsford. The project focused on maximising vertical space to increase both office and storage capacity without the need for relocation.
Design and construction of a steel mezzanine structure
38mm tongue-and-groove particle board decking
Partitioning and office fit-out to the mezzanine level
Optional enhancements including suspended ceilings, lighting and shelving